ONE’s P11-E PLATFORM UP AND RUNNING
Introducing an innovative platform design, Oranje-Nassau Energie (ONE) has started the production from the gas platform P11-E, located at the North Sea about 50 kilometres outside the Dutch coast. The new platform concept enables ONE to economically develop two marginal fields, despite current gas prices. The production has started in October 2016 and is estimated to end in 2022. During that period 650 million Nm3 gas is expected to be recovered. The satellite operates emissions-free. Power is generated by a unique combination of solar and windmills, storing renewable energy in batteries.
(courtesy ONE: http://www.onebv.com/node/318)

Enersea’s involvement for this project included:
– Structural lead engineering
– Interface management for:
   o Pipeline and riser design and installation
   o Platform transportation & installation
– Certification liaison
– Permit support
– Offshore installation representation

pipelay-survey
Pipelay survey

pipeline-trenching
Pipeline trenching

up-ending
Substructure up-ending for transportation purposes

lifting
Substructure lifting

installed
Installed platform