Living Stone Cable Lay Spread

26 February 2021

In delevering a highly efficient Cable Lay Vessel to support future projects, Tideway selected Enersea to design the deck lay-out…

Moray East External Jacket Lift Tool

To aid swift installation of Offshore Wind Turbine foundations Enersea designed a External Jacket Lift Tool. The tool has succesfully…

P11-E Platform Engineering Management

To support local water knock out of gas produced from the P11-E gas discovery a new unmanned plaform was designed…

F2A Hanze Life Time Extension Analysis

The F2A Hanze platform has been operating since 2001 and for the purpose of re-certification, Enersea conducted an Life Time…

Horizon West Oil well ERD tie-back

An oil discovery has been tied-back to existing infrastructure with an 8km Extened Reach Drilled well. Flow Assurance in the…

P11 Unity Gas Production Platform

Two modest gas discoveries are being tied-back to de Ruyter platform based on a novel field development concept designed by…

D12 Gas Field Development

The D12 gas field at the UKCS border was developed by re-use of an existing topside onto a new jacket…

Triton Knoll structural engineering Management

In the development of the Triton Knoll wind park enersea led the engineering management  for the 3SF consortium. The scope…