26 February 2021

Horizon West Oil well ERD tie-back

An oil discovery has been tied-back to existing infrastructure with an 8km Extened Reach Drilled well. Flow Assurance in the well and the 45 km live oil pipeline was seen as the key to assess facility set-up. Enersea was tasked with the analysis, control definition and later piping intergartion on two existing oil platforms. 