The multipurpose vessel ‘Living Stone’ will be the most advanced in its class. The vessel features DP3 (Dynamic Positioning 3) capability together with an important total loading capacity of 12.500 tons. It will be equipped with two large 5.000 tons cable/umbilical carrousels arranged below deck allowing for a free deck space of ca. 3500 m²,which accommodates the modular cable/umbilical handling systems, remotely operated vehicles (ROVs), the subsea trenching tool CBT 1100 and the fall-pipe system. A central moon pool of 7,7m by 7,7m and the installation of a 600 ton crane for subsea installation and removal complete this arrangement (courtesy Tideway).