P11 Unity Gas Production Platform

Project Name: P11 Unity Gas Production Platform
Client: P11 Unity Gas Production Platform
Location: Dutch North Sea

Two modest gas discoveries are being tied-back to de Ruyter platform based on a novel field development concept designed by Enersea. After careful evaluation against subsea options, the platform concept was selected, designed, fabricated and installed. Currently assumed to be the smallest, or better, most cost effective platform to date in the southern North Sea. For the facilities Enersea was tasked with the engineering management, full platform design scope, pipeline design and flow assurance, umbilical specification and offshore installation management.

Feel free to get in touch!

Looking forward to meeting you.

Dieter Korndorffer - Managing Consultant Hydrocarbons

Get in touch

Fill out the form below, and we’ll get back to you soon.

This field is for validation purposes and should be left unchanged.