Living Stone Cable Lay Spread
February 26, 2021 11:48 am Comments Off on Living Stone Cable Lay SpreadIn delevering a highly efficient Cable Lay Vessel to support future projects, Tideway selected Enersea to design the deck lay-out…
In delevering a highly efficient Cable Lay Vessel to support future projects, Tideway selected Enersea to design the deck lay-out…
To aid swift installation of Offshore Wind Turbine foundations Enersea designed a External Jacket Lift Tool. The tool has succesfully…
To support local water knock out of gas produced from the P11-E gas discovery a new unmanned plaform was designed…
The F2A Hanze platform has been operating since 2001 and for the purpose of re-certification, Enersea conducted an Life Time…
An oil discovery has been tied-back to existing infrastructure with an 8km Extened Reach Drilled well. Flow Assurance in the…
Two modest gas discoveries are being tied-back to de Ruyter platform based on a novel field development concept designed by…
The D12 gas field at the UKCS border was developed by re-use of an existing topside onto a new jacket…
In the development of the Triton Knoll wind park enersea led the engineering management for the 3SF consortium. The scope…